What we build
Maintenance and repair
Maintenance, repair and restructuring of palapas: reinforcing or replacing damaged members to make the structure sound again.
Fumigation and timber sealing every 6 months; rethatching every 5 to 7 years, depending on roof pitch.
We care for any palapa, whoever built it.

How we work
Site visit
We walk the site with you or your architect: orientation, wind, access, ground.
Proposal
Concept, dimensions, materials and a written estimate.
Workshop and build
Timber selection and preparation in the workshop; on-site assembly by our own crew.
Handover and care
A maintenance programme.
Drawings ready, or only an idea? Either is enough to start.
Request a quote
