What we build

Maintenance and repair

Maintenance, repair and restructuring of palapas: reinforcing or replacing damaged members to make the structure sound again.

Fumigation and timber sealing every 6 months; rethatching every 5 to 7 years, depending on roof pitch.

We care for any palapa, whoever built it.

Underside of a palm and timber roof

How we work

  1. Site visit

    We walk the site with you or your architect: orientation, wind, access, ground.

  2. Proposal

    Concept, dimensions, materials and a written estimate.

  3. Workshop and build

    Timber selection and preparation in the workshop; on-site assembly by our own crew.

    Schedule depends on the project

  4. Handover and care

    A maintenance programme.

Drawings ready, or only an idea? Either is enough to start.

Request a quote